PNC Infratech Limited An ISO 9001:2008 Certified Company Frauduent Offers For Employment PNC Infratech Limited
PNC Infratech Limited PNC Infratech Limited PNC Infratech Limited
PNC Infratech Limited PNC Infratech Limited PNC Construction Company Limited
PNC Infratech Limited
PNC Infratech Limited
Home » Our Projects » Highway Projects
PNC Infratech Limited
PNC Infratech Limited
PNC Infratech Limited
PNC Infratech Limited
PNC Infratech Limited
PNC Infratech Limited
PNC Infratech Limited
PNC Infratech Limited
PNC Infratech Limited


PNC Infratech Limited

PNC Infratech Limited

1. EPC - Ongoing Highway Projects

Sl No. Name of Projects Employer Location
1 Four Laning of Koilwar to Bhojpur from Km. 137.375 of NH-30 to Km. 27.370 of NH-84 (Design Chainage Km. 33.250 to Km. 77.100) in the State of Bihar under NHDP Phase-III on EPC mode National Highways Authority of India Bihar
2 Four Laning of Bhojpur to Buxar from Km. 27.370 to Km. 75.00 of NH-84 (Design Chainage Km. 77.100 to Km. 125.00) in the State of Bihar under NHDP Phase-III on EPC mode National Highways Authority of India Bihar
3 Project of construction of three lane road on both sides of Sharda Sahayak Feeder Canal from Lucknow-Faizabad Road to Lucknow- Sultanpur Road in Uttar Pradesh Public Works Department (PWD) Uttar Pardesh
4 4-laning of Varanasi Gorakhpur section of NH-29 from Km. 12.000 (Design chainage 12.010) to Km. 88.000 (Design Chainage Km. 84.160) [Package-II from Sandah to Birnon] in the State of Uttar Pradesh under NHDP Phase-IV on Engineering, Procurement and Construction (EPC) Mode Project. National Highways Authority of India Uttar Pradesh
5 Four Laning of Distt. Etah to Distt. Kasganj Headquarter (Widening & Strengthening of Etah-Kasganj Road O.D.R. Chainage 0.00 to 24.30 Km. and Bareilly - Mathura Road SH-33 Chainage 161.50 to 145.00 Km.) Total length 40.80 Km. (Distt. Etah-20.00 Km & Distt. Kasganj-20.80 Km.) Public Works Department (PWD) Uttar Pradesh
6 Four laning of Nagina-Kashipur section of NH-74 from km 73.000 to Km 175.00 in the states of Uttarakhand and Uttar Pradesh under NHDP IV". National Highways Authority of India Uttar Pradesh
7 Development of Purvanchal Expressway (Package-V) From Sansarpur (Dist. Sultanpur) to Gobindpur (Dist. Azamgarh) (Km 164+300 to Km 218+300) Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) Uttar Pradesh
8 Development of Purvanchal Expressway (Package-VI) From Gobindpur (Dist. Azamgarh) to Mojrapur (Dist. Azamgarh) (Km 218+300 to Km 246+500) Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) Uttar Pradesh
9 Construction of access controlled Nagpur – Mumbai Super Communication Expressway (Maharashtra SamruddhiMahamarg) in the State of Maharashtra on EPC mode for Package – 4, from Km. 162.667 to Km. 217.023 in section (Village Donad Bk. to Village JanunaKh) in Washim District” Maharashtra State Road Development Corporation Maharashtra
10 Widening and Strengthening of 63.65 km long Lakhimpur to Dudhawa National Park State Highway (Two Lane with Paved Shoulders) in the District of Lakhimpur - Kheri, U.P Public Works Department (PWD) Uttar Pradesh
11 Construction of 31.7 km long 4 Lane Bypass connecting NH-56 at km 17.400 and terminating near Behta Village Road under NHDP Phase-VII on EPC mode' namely 'Lucknow Ring Road Package I' National Highways Authority of India Uttar Pradesh



2. BOT-(TOLL)/BOT (Annuity)/OMT/HAM Highway Projects

2.1 Ongoing Projects (Under Implementation)

Sl No. Name of Projects Employer Location
1 Six laning Chitradurga - Davanagere including Chitradurga bypass design chainage km 0.000 to km 20.700 and Km 208.000 to km 260.000 of NH 48 (Old NH-4) in the state of Karnataka under NHDP V on Hybrid Annuity Mode. National Highways Authority of India Rajasthan
2 4 laning Jhansi -Khajuraho section of NH 75/76 (Package I) from km 0.00 to km 76.30 in the states of UP & MP under NHDP III on Hybrid Annuity Mode. National Highways Authority of India Uttar Pradesh
3 4 laning Jhansi-Khajuraho section of NH 75/76 (Package II) from km 76.30 to km 161.70 in the states of UP & MP under NHDP III on Hybrid Annuity Mode. National Highways Authority of India Uttar Pradesh
4 Four Laning of Aligarh – Kanpur section from KM 186.000 (Design chainage 195.733) to km 229.000 (Design chainage 240.897) [Package‐II from Bhadwas – Kalyanpur] of NH‐91 on Hybrid Annuity Mode. National Highways Authority of India Uttar Pradesh
5 Six Laning of Chakeri Allahabad section of NH-2 (from Km 483.687 to Km 628.753) on HAM mode. National Highways Authority of India Uttar Pradesh
6 Four Laning from km 358.500 to km 414.205, Challakere to Hariyur section of NH-150 A on Hybrid Annuity Mode. National Highways Authority of India Karnataka
7 Four Laning of Unnao-Lalganj section of NH 232 A from km 0.000 to 70.000 under NHDP IVB on Hybrid Annuity Mode. National Highways Authority of India Uttar Pradesh
8 Four laning of Jagdishpur - Faizabad Section from km 47.930 (Design Chaiange km 47.800) to km 107.680 (Design Chainage km 108.020) of NH-330A on Hybrid Annuity Mode. National Highways Authority of India Uttar Pradesh
9 4 laning of Aligarh- Kanpur Section from Km 356.000 (Design chainage Km. 373.085) to Km.414.000 (Design chainage Km.433.728), Package - V, Mitrasen - Kanpur section of NH- 91 on Hybrid Annuity Mode. National Highways Authority of India Uttar Pradesh
10 53.95 km long Four-laning of Meerut - Nazibabad section of NH-119 (New NH-34) from design chainage Km 11+500 (Meerut) to 39.250 (Behsuma) and from km 79.500 (Bijnor) to 105.700 (Jalalabad) on Hybrid Annuity Mode. National Highways Authority of India Uttar Pradesh


2.2 Ongoing Projects (Under Operation)

Sl No. Name of Projects Employer Location
1 Strengthening, Widening, Maintaining and Operating of Gwalior-Bhind-MP/UP Border (NH-92) on BOT basis. MPRDC MP/UP
2 Four laning (with Paved Shoulders of Bareilly-Almora Section of SH-37 in State of Uttar Pradesh on DBFOT basis. UPSHA Uttar Pradesh
3 Two Laning with Paved Shoulders of Raebareli to Jaunpur Section (Km 0+000 to Km 166.4000) of NH-231 in the State of Uttar Pradesh Under NHDP IVA on BOT (Annuity) On DBFOT Pattern. NHAI Uttar Pradesh
4 Operation and Maintenance of Kanpur-Lucknow Section (Km. 11.005 to Km. 75.500) stretch of NH-25 and Lucknow Bypass (Km. 0.000 to Km. 22.850) stretch of NH-56A & 56B and Lucknow-Ayodhya Section (Km. 8.000 to Km. 137.970) stretch of NH-28 (Total Length 217.315 Km.) in the State of Uttar Pradesh on OMT Basis NHAI Uttar Pradesh
5 Two Laning with Paved Shoulders of Kanpur - Kabrai Section of NH-86 from K. 7.430 to Km. 130.100 in the State of Uttar Pradesh on DBFOT Basis. NHAI Uttar Pradesh
6 4 Laning/ 2-Laning with paved shoulder of Dausa-Lalsot-Kauthun section on Hybrid Annuity Mode. NHAI Rajasthan




PNC Infratech Limited
PNC Infratech Limited
Member IndiaMART.com© PNC Infratech Limited. All Rights Reserved (Terms of Use)
Developed and Managed by IndiaMART InterMESH Limited

Looking for Product Name ?