| Sl No. |
Name of Projects |
Employer |
Location |
| 1 |
Construction of Jaora-Nayagaon Section From Km.125.00 to Km.252.81 on SH-31 to 4-Lane section including bypass in the State of Madhya Pradesh in JV with other firms on DBFOT-Toll model. |
Madhya Pradesh Road Development Corporation Ltd. |
Madhya Pradesh |
| 2 |
Construction Strengthening, Widening, Maintaining and Operating of Gwalior - Bhind- MP/UP Border (NH-92) on DBFOT-Toll model |
Madhya Pradesh Road Development Corporation Ltd. |
Madhya Pradesh |
| 3 |
Construction of Ghaziabad-Aligarh Section of NH-91 from Km.23.600 to km 140.200 in the State of Uttar Pradesh Under NHDP Phase III on Design, Build, Finance, Operate and Transfer (the "DBFOT") basis in JV with other firms. |
National Highways Authority of India |
Uttar Pradesh |
| 4 |
Construction of 2 laning with paved shoulders of Kanpur to Kabrai section of NH-86 from Km 7.430 to Km 130.100 in the State of Uttar Pradesh on Design, Build, Finance, Operate and Transfer (DBFOT) basis. |
National Highways Authority of India |
Uttar Pradesh |
| 5 |
Construction Development of four laning of Bareilly - Almora - Bageshwar Road (up to Uttrakhand Border) (SH-37) on Design, Build, Finance, Operate and Transfer (DBFOT) basis. |
Uttar Pradesh State Highways Authority |
Uttar Pradesh |
| 6 |
Construction of Two Laning with paved shoulders of Raibareili to Jaunpur (Km.0.100 to 166.400 Km) of NH-231 in the state of Uttar Pradesh on BOT/Annuity model. |
National Highways Authority of India |
Uttar Pradesh |
| 7 |
Construction of new 4 Lane Agra Bypass. |
National Highways Authority of India |
Uttar Pradesh |
| 8 |
Four-laning of the existing two lane section of the Etawah bypass (km 307.5 to km 321) on NH-2 |
National Highways Authority of India |
Uttar Pradesh |
| 9 |
Development of Phase-II of Package-6 for road no. 9. SH-19, Porsa-Mehgaon-Mau-Seonda section, totalling 77.4 km |
Madhya Pradesh Road Development Corporation Limited (funded by the Asian Development Bank) |
Madhya Pradesh |
| 10 |
Four-laning of Agra-Gwalior section (km 8 to km 24) of NH-3, including the construction of a major bridge on the Khari River (contract package No. NS-4) |
National Highways Authority of India |
Uttar Pradesh |
| 11 |
Four-laning of Agra-Gwalior section (km 24 to km 41) of NH-3, including construction of a ROB (contract package No. NS-19) |
National Highways Authority of India |
Uttar Pradesh |
| 12 |
Short-term improvement and maintenance of the Panipat–Jalandhar section (km 96 to km 372.86) on NH-1, including collection of user fee charges. |
National Highways Authority of India |
Punjab |
| 13 |
Development of the Sagar Beena Road, totalling 71.8 km under Madhya Pradesh Road Sector Development Program Phase I |
Madhya Pradesh Road Development Corporation Limited (funded by Asian Development Bank) |
Madhya Pradesh |
| 14 |
Major maintenance of 45 km road at Bareily-Badaun in Uttar Pradesh. |
Public Works Department, (funded by World Bank) |
Uttar Pradesh |
| 15 |
Construction of a new road admeasuring 48 km in Magnet City of Special Area Development Authority of Madhya Pradesh at Gwalior and other road widening works. |
Special Area Development Authority – Madhya Pradesh |
Madhya Pradesh |
| 16 |
Construction work under the Uttar Pradesh State Road Project for package no. UPSRP/RMC/37 (Kasganj-Hathras). |
Public Works Department (World Bank funded) |
Uttar Pradesh |
| 17 |
Construction work under the Uttar Pradesh State Road Project for package no. UPSRP/RMC/42 (Etah - Sikohabad) |
Uttar Pradesh - Public Works Department (World Bank funded) |
Uttar Pradesh |
| 18 |
Widening and Strengthening the Garhmukteshwar- Moradabad Section of NH-24 to four-lane standards (Km 93 to Km 149.25) and bridges on NH-87 (Package II) - Part-I, in Joint Venture - PNC - BEL JV. |
National Highways Authority of India. |
Uttar Pradesh |
| 19 |
Improvement of Gurgaon-Nuh-Rajasthan border at SH-13 (km 7.20 to km 95.89) by four-laning, widening, strengthening and providing drains and culverts along with widening of bridges, retaining structures and other miscellaneous works. |
Haryana State Road & Bridges Development Corporation Limited |
Haryana |
| 20 |
Design and construction of the four-laning of Jaora -Nayagaon section of SH-31 (from km 125 to km 252.81). |
Jaora Nayagaon Toll Road Company Private Limited |
Madhya Pradesh |
| 21 |
Rehabilitation and upgradation of: |
Madhya Pradesh Road Development Corporation Limited |
Madhya Pradesh |
| (a)Gairatganj-Silwani-Gadarwada (SH-44), |
| (b)NH-12 junction to Silwani (SH-15) |
| (c)Bareli-Pipariya Road (SH-19) |
| 22 |
Widening, strengthening and beautification of the Goverdhan Parikarma Marg |
Public Works Department, Aligarh |
Uttar Pradesh |
| 23 |
Rehabilitation road work of major district road no. 139 Chatta to Gomat (from chainage km. 0.00 to chainage km 42.00) |
Public Works Department, |
Uttar Pradesh |
| 24 |
Construction of two laning the Agra-Samshabad-Rajakhera Road |
Public Works Department, Agra |
Uttar Pradesh |
| 25 |
Construction of ROB and approaches on Ajmer-Beawar Road in Rajasthan |
Rajasthan State Road Development and Construction Corporation Ltd. |
Rajasthan |
| 26 |
Construction of F.O.B. across Dahisar river, near Rustamjee School, Dahisar (West), Mumbai. |
Municipal Corporation of Brihnmumbai, Mumbai |
Maharashtra |
| 27 |
EPC contract for designing, engineering, finance, construction, operation and maintenance of Ghaziabad-Aligarh section of NH-91 from km 23.600 to km 140.200 in Uttar Pradesh under NHDP Phase-III on DBFOT basis |
Ghaziabad Aligarh Expressway Private Limited |
Uttar Pradesh |
| 28 |
Four laning of km 51 to 61 (Including Chambal Bridge) on Dholpur-Morena Section of NH-3 on North-South corridor in the state of Rajasthan-Madhya Pradesh in JV with TRG |
National Highways Authority of India |
Rajasthan/ Madhya Pradesh |
| 29 |
Construction of Balance work of New Four Lane Agra By-pass connecting Km 176.800 of NH-2 to Km 13.03 of NH-3 in the state of UP. |
National Highways Authority of India |
Uttar Pradesh |
| 30 |
Construction of four laning of Bareilly - Almora - Bageshwar Road(up to Uttrakhand Border) (SH-37). |
PNC Bareilly Nainital Highways Private Limited |
Uttar Pradesh & Uttrakhand |
| 31 |
2 Laning with paved shoulders of Raebareli to Jaunpur section (Km.0.000 to 166.400) of NH-23't in the state of Uttar Pradesh under NHDP-IV. |
PNC Raebareli Highways Private Limited |
Uttar Pradesh |
| 32 |
Widening in four lane and Strengthening of Agra-Shamshabad Road in District Agra. |
Public Works Department, |
Uttar Pradesh |
| 33 |
Construction of Hamipur Kalpi Road road (SH No. 91) Four Lane from Km. 1 to 22 under Rajya Yojna Samanya Year 2013 -14 |
Public Works Department, |
Uttar Pradesh |
| 34 |
Widening & strengthening work of single lane to Two-Lane in Lalitpur-Kailgua Road NH-44 Ch. 96.88 to Buragaon Power generation Station Plant |
Public Works Department, |
Uttar Pradesh |
| 35 |
Widening and strengthening work from Km. 55 to 78 of Pilibhit-Bareilly-Budaun-Mathura-Bharatpur (State Highway No. 33 Length 24.00 Km.) in Distt. Bareilly (Under Plant connecting District Headquarter by four lane) |
Public Works Department, |
Uttar Pradesh |
| 36 |
Widening and strengthening (4-laning) of Pilibhit-Bareilly-Badaun-Mathura-Bharatpur Road (SH-33, length 20.80 Km) from Km. 79 to 99(800) in Distt. Badaun |
Public Works Department, |
Uttar Pradesh |
| 37 |
Widening and strengthening work of 3.50 Km. long road in Kannaj District |
Public Works Department, |
Uttar Pradesh |
| 38 |
Widening and strengthening work of 29.30 Km. long road in Farrukhabad District |
Public Works Department, |
Uttar Pradesh |
| 39 |
Project of improvement / augmentation of 146.4 km long Aligarh-Moradabad section of NH-93 to two lanes with paved shoulders, in the state of Uttar Pradesh, under NHDP Phase-IV. |
National Highways Authority of India |
Uttar Pradesh |
| 40 |
Rehabilitation and upgradation of Sonauli to Gorakhpur section (Km.0+000 to Km.80+000) of NH-29E in Uttar Pradesh to two lane with paved shoulders on EPC mode under NHDP Phase-IV. |
Ministry of Road Transport & Highways |
Uttar Pradesh |
| 41 |
Rehabilitation and upgradation of Barabanki-Jarwal section of NH-28C (Km. 0.000 to Km. 43.000) in the state of Uttar Pradesh under NHDP-IV on EPC Basis. |
Ministry of Road Transport & Highways |
Uttar Pradesh |
| 42 |
Upgradation of MDR No. 82W Nanau - Dadon (Section from Km. 0.000 to Km. 30.000) in District Aligarh. |
UP Public Works Department (PWD) |
Uttar Pradesh |
| 43 |
4 Laning/ 2-Laning with paved shoulder of Dausa-Lalsot-Kauthun section on Hybrid Annuity Mode. |
National Highways Authority of India |
Rajasthan |
| 44 |
Project of construction of three lane road on both sides of Sharda Sahayak Feeder Canal from Lucknow-Faizabad Road to Lucknow- Sultanpur Road in Uttar Pradesh," |
Public Works Department (PWD) |
Uttar Pardesh |
| 45 |
4-laning of Varanasi Gorakhpur section of NH-29 from Km. 12.000 (Design chainage 12.010) to Km. 88.000 (Design Chainage Km. 84.160) [Package-II from Sandah to Birnon] in the State of Uttar Pradesh under NHDP Phase-IV on Engineering, Procurement and Construction (EPC) Mode Project. |
National Highways Authority of India |
Uttar Pradesh |
| 46 |
Four Laning of Distt. Etah to Distt. Kasganj Headquarter (Widening & Strengthening of Etah-Kasganj Road O.D.R. Chainage 0.00 to 24.30 Km. and Bareilly - Mathura Road SH-33 Chainage 161.50 to 145.00 Km.) Total length 40.80 Km. (Distt. Etah-20.00 K. & Distt. Kasganj-20.80 Km.) |
Public Works Department (PWD) |
Uttar Pradesh |
| 47 |
four laning of Nagina-Kashipur section of NH-74 from km 73.000 to Km 175.00 in the states of Uttarakhand and Uttar Pradesh under NHDP IV". |
National Highways Authority of India |
Uttar Pradesh |
| 48 |
Development of Agra to Firozabad (Village Guha) (Km. -2.634 to 0.000 to 53.500) Access Controlled Expressway (Green Field) Project in the State of Uttar Pradesh on EPC mode. |
Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) |
Uttar Pradesh |
| 49 |
Development of Purvanchal Expressway (Package-V) From Sansarpur (Dist. Sultanpur) to Gobindpur (Dist. Azamgarh) (Km 164+300 to Km 218+300) |
Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) |
Uttar Pradesh |
| 50 |
Development of Purvanchal Expressway (Package-VI) From Gobindpur (Dist. Azamgarh) to Mojrapur (Dist. Azamgarh) (Km 218+300 to Km 246+500) |
Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) |
Uttar Pradesh |
| 51 |
Six laning Chitradurga - Davanagere including Chitradurga bypass design chainage km 0.000 to km 20.700 and Km 208.000 to km 260.000 of NH 48 (Old NH-4) in the state of Karnataka under NHDP V on Hybrid Annuity Mode. |
National Highways Authority of India |
Karnataka |
| 52 |
Four Laning of Aligarh – Kanpur section from KM 186.000 (Design chainage 195.733) to km 229.000 (Design chainage 240.897) [Package‐II from Bhadwas – Kalyanpur] of NH‐91 on Hybrid Annuity Mode. |
National Highways Authority of India |
Uttar Pradesh |
| 53 |
4 laning Jhansi-Khajuraho section of NH 75/76 (Package II) from km 76.30 to km 161.70 in the states of UP & MP under NHDP III on Hybrid Annuity Mode. |
National Highways Authority of India |
Uttar Pradesh & Madhaya Pradesh |
| 54 |
4 laning Jhansi -Khajuraho section of NH 75/76 (Package I) from km 0.00 to km 76.30 in the states of UP & MP under NHDP III on Hybrid Annuity Mode. |
National Highways Authority of India |
Uttar Pradesh & Madhaya Pradesh |
| 55 |
Construction of access controlled Nagpur – Mumbai Super Communication Expressway (Maharashtra SamruddhiMahamarg) in the State of Maharashtra on EPC mode for Package – 4, from Km. 162.667 to Km. 217.023 in section (Village Donad Bk. to Village JanunaKh) in Washim District” |
Maharashtra State Road Development Corporation (MSRDC) |
Maharashtra |
| 56 |
4 laning Jhansi -Khajuraho section of NH 75/76 (Package I) from km 0.00 to km 76.30 in the states of UP & MP under NHDP III on Hybrid Annuity Mode. |
National Highways Authority of India |
Uttar Pradesh |
| 57 |
Four Laning of Koilwar to Bhojpur from Km. 137.375 of NH-30 to Km. 27.370 of NH-84 (Design Chainage Km. 33.250 to Km. 77.100) in the State of Bihar under NHDP Phase-III on EPC mode |
National Highways Authority of India |
Bihar |
| 58 |
Four Laning of Bhojpur to Buxar from Km. 27.370 to Km. 75.00 of NH-84 (Design Chainage Km. 77.100 to Km. 125.00) in the State of Bihar under NHDP Phase-III on EPC mode |
National Highways Authority of India |
Bihar |
| 59 |
Construction of 31.7 km long 4 Lane Bypass connecting NH-56 at km 17.400 and terminating near Behta Village Road under NHDP Phase-VII on EPC mode' namely 'Lucknow Ring Road Package-I' |
National Highways Authority of India |
Uttar Pradesh |
| 60 |
Construction of Eight Lane access-controlled expressway starting from Junction with NH-47 near Bhamaiya village and ending at Junction with SH-175 in Baletiya village in Panchmahal district (Ch. 780+920 to 803+420; design Ch. 328+500 to Ch. 351+000) section of Delhi – Vadodara (Pkg 29) Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat |
National Highways Authority of India |
Gujarat |
| 61 |
Six Laning of Chakeri Allahabad section of NH-2 (from Km 483.687 to Km 628.753) on HAM mode. |
National Highways Authority of India |
Uttar Pradesh |
| 62 |
Four Laning from km 358.500 to km 414.205, Challakere to Hariyur section of NH-150 A on Hybrid Annuity Mode. |
National Highways Authority of India |
Karnataka |
| 63 |
Four Laning of Unnao-Lalganj section of NH 232 A from km 0.000 to 70.000 under NHDP IVB on Hybrid Annuity Mode. |
National Highways Authority of India |
Uttar Pradesh |
| 64 |
Four laning of Jagdishpur - Faizabad Section from km 47.930 (Design Chaiange km 47.800) to km 107.680 (Design Chainage km 108.020) of NH-330A on Hybrid Annuity Mode. |
National Highways Authority of India |
Uttar Pradesh |
| 65 |
4 laning of Aligarh- Kanpur Section from Km 356.000 (Design chainage Km. 373.085) to Km.414.000 (Design chainage Km.433.728), Package - V, Mitrasen - Kanpur section of NH- 91 on Hybrid Annuity Mode. |
National Highways Authority of India |
Uttar Pradesh |
| 66 |
53.95 km long Four-laning of Meerut - Nazibabad section of NH-119 (New NH-34) from design chainage Km 11+500 (Meerut) to 39.250 (Behsuma) and from km 79.500 (Bijnor) to 105.700 (Jalalabad) on Hybrid Annuity Mode. |
National Highways Authority of India |
Uttar Pradesh |
| 67 |
Six lane upgradable to Eight lane of Kanpur Lucknow Expressway including spur from Km 28+500 to Km 73+744 in the state of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana (Package-2) (the “Project”) on design, build, operate and transfer basis (the “DBOT Annuity” of Hybrid Annuity) |
National Highways Authority of India |
Uttar Pradesh |
| 68 |
Improvement and up-gradation of Existing Road to 4–lane with Paved Shoulder from Km 175.080 to 229.070, End of Hardoi Bypass to End of Hardoi District of NH-731 (Pkg-III) on Hybrid Annuity Mode under NH(O) in the state of Uttar Pradesh on design, build, operate and transfer (the “DBOT Annuity or Hybrid Annuity”) basis |
National Highways Authority of India |
Uttar Pradesh |
| 69 |
Four laning of NH 530B from Mathura Bypass (Start) (Existing km. 266.000 of SH 33/Design km 0.000) to Gaju Village (End) (Design km. 32.982) (Design Length= 32.982 km) in the state of Uttar Pradesh on Hybrid Annuity Mode (Package 1-B) Four-Laning thereof (the “Project”) on design, build, operate and transfer (the “DBOT Annuity” or “Hybrid Annuity”) basis |
National Highways Authority of India |
Uttar Pradesh |
| 70 |
Four Laning of NH 530B from Gaju Village (Design km 32.982, Mathura -Aligarh District Boundary) to Devinagar Bypass (End) (Existing Km. 208.000 of SH 33(NH-530B)/Design Km. 66.000) (Design length = 33.018 km) in the State of Uttar Pradesh on Hybrid Annuity Mode (Package-1C) Four-Laning thereof (the “Project”) on design, build, operate and transfer (the “DBOT Annuity” or “Hybrid Annuity”) basis |
National Highways Authority of India |
Uttar Pradesh |
| Sl No. |
Name of Projects |
Employer |
Location |
| 1 |
Strengthening of the main runway 19L/01R and providing CAT-II lighting at 19L approach at the NSCBI Airport, Kolkata. |
Airports Authority of India |
West Bengal |
| 2 |
Up gradation of airstrips for operation of Boeing 737 type aircrafts at the Saifai Etawah. |
RITES Ltd. |
Uttar Pradesh |
| 3 |
Resurfacing of existing runway and shoulders and area drainage works at Air Force Station, Yelahanka, Near Bangalore |
Military Engineer Services |
Karnataka |
| 4 |
Resurfacing of runway, taxiway at the civil airdrome, Raipur, Chhattisgarh |
RITES Ltd. |
Chhattisgarh |
| 5 |
Resurfacing of hard standing at Mehra Chowk at 402 AFS Chakeri. |
Military Engineer Services |
Uttar Pradesh |
| 6 |
Strengthening of Runways and Construction of allied facilities at Kasia (U.P.) |
RITES Ltd. |
Uttar Pradesh |
| 7 |
Extension and up gradation of the existing Dehradun Airport for the operation of AB-320/B-737-800 type aircrafts. |
Airports Authority of India |
Uttarakhand |
| 8 |
Extension of the pavement and allied works services (Group B) at the Air Force Stations, Bidar, Karnataka. |
Military Engineer Services |
Karnataka |
| 9 |
Construction of a runway and allied works at Madurai Airport. |
Airports Authority of India |
Tamil Nadu |
| 10 |
Construction of the main runway and rapid exit taxi track at the Air Force Station, Pune, Maharashtra |
Military Engineer Services |
Maharashtra |
| 11 |
Extension and strengthening of the runway and construction of the new apron and isolation bay and associated works at the Devi Ahilyabai Holkar Airport, Indore, Madhya Pradesh |
Airports Authority of India |
Madhya Pradesh |
| 12 |
Construction of a runway, taxi track and civil Airport at Meerut, Airstrip, UP |
RITES Ltd |
Uttar Pradesh |
| 13 |
Expansion and strengthening of apron and construction of new taxiway and associated works at the Lucknow Airport, UP. |
Airports Authority of India |
Uttar Pradesh |
| 14 |
Widening, extending and resurfacing of parallel taxi track and associated works at Air Force Station, Maharajpur, Gwalior, MP. |
Military Engineer Services |
Madhya Pradesh |
| 15 |
Expansion of Apron at Civil Enclave at Jorhat Airport, Assam |
Airport Authority of India |
Assam |
| 16 |
Work services for resurfacing of runway, extension of runway and allied works at Air Force Station Jorhat, Assam |
Military Engineering Services |
Assam |
| 17 |
Extension of Runways, Parallel Taxi Track, Boundary wall and Allied works at Birsi Airport, Gondia, Maharashtra |
Airport Authority of India |
Maharashtra |
| 18 |
Resurfacing of runway and allied works at Air Force Station Gorakhpur, U.P |
Military Engineer Services |
Uttar Pradesh |
| 19 |
Resurfacing of runway and allied works at Air Force Station, Panagarh, West Bengal. |
Military Engineering Services |
West Bengal |
| 20 |
Resurfacing / Strengthening of runway and allied works at Ghazipur (UP) |
RITES Ltd. |
Uttar Pradesh |
| 21 |
Resurfacing / Strengthening of runway and allied works at Farukhabad (UP) |
RITES Ltd. |
Uttar Pradesh |
| 22 |
Extension and Resurfacing of Runway at Air Force Station Bakshi-ka-Talab, Lucknow |
Military Engineer Services |
Uttar Pradesh |
| 23 |
Resurfacing/strengthening of Runway at Air Force Station Chakeri (Kanpur) |
Military Engineer Services |
Uttar Pradesh |